TO: Mayor and City Council
FROM: Allison Swisher, Director of Public Utilities
SUBJECT:
title
Award of Contract for the Twin Oaks Phase 1 Water Main Improvements Project to M&J Underground Inc in the Amount of $1,968,957.82
end
BACKGROUND:
On January 5, 2021, the Mayor and City Council approved Resolution No. 7613, committing to water conservation through the reduction of non-revenue water in order to comply with the allocation requirements of the Level of Lake Michigan Act, 615 ILCS 50, and the corresponding State regulations. A condition of the City’s Lake Michigan water allocation permit is completion of the City’s Non-Revenue Water Reduction Plan. A major component of this Plan is water main replacement. The water main replacement, estimated at approximately 3% per year, must be sufficient to achieve the reduction of non-revenue water from the City’s water system to not more than 10 percent by the year 2030.
The 2025 Water Main Replacement Program consists of 16 contracts to replace a total of approximately 29 miles of water main, at a cost of approximately $74,500,000.00. As part of this water main replacement plan, the Twin Oaks Phase 1 Water Main Improvements Project was identified to be completed in 2025. This project consists of replacing approximately 5,400 linear feet of water main in various sizes on Rebecca Rd. (Deerpath Dr. to Twin Oaks Dr.); Crabapple Ct., Cranberry Ct. and Robert Ct.; Deerpath Dr. (N. Essington Rd. to Rebecca Rd.); Twin Oaks Dr. (N. Essington Rd. to Rebecca Rd.); and Heritage Dr. (N. Essington Rd. to private drive). Attached to this memo is an exhibit showing the project location.
Design drawings and bidding documents were prepared and the invitation to bid for the project was advertised in the Joliet Herald-News on Thursday, October 24, 2024. The Public Service Committee will review this matter.
CONCLUSION:
On Wednesday, December 11, 2024, at 10:00 a.m., seven (7) sealed bids were received for the Twin Oaks Phase 1 Water Main Improvements Project. The bid summary is as follows:
CONTRACTOR BID AMOUNT
M&J Underground, Inc., Monee, IL $1,968,957.82
Construction by Camco, Inc., Joliet, IL $2,004,753.84
P.T. Ferro Construction, Joliet, IL $2,063,883.61
Scanlon Excavating & Concrete, Kankakee, IL $2,093,632.20*
Austin Tyler Construction, Inc., Elwood, IL $2,284,082.61
D Construction Inc., Coal City, IL $2,628,655.50*
J. Congdon Sewer Service, Inc., Carol Stream, IL $2,793,565.36*
Engineer’s Estimate $2,610,000.00
* denotes corrected amount after mathematical errors were corrected
The low bid from M&J Underground, Inc., in the amount of $1,968,957.82, is 24.56% below the engineer’s estimate. M&J Underground, Inc. has previously completed similar work for the City and completed this work to the City’s satisfaction.
Funds will be charged to the Water Main Replacement Fund (Org 53880000, Object 557200, $1,968,957.82).
RECOMMENDATION:
recommendation
Based on the above, Staff recommends that the Mayor and City Council award the Contract for the Twin Oaks Phase 1 Water Main Improvements Project, in the amount of $1,968,957.82, on behalf of M&J Underground Inc.
end