Title: Approval of Change Order No. 1 for Contract No. 2938-0126 for the JOL-08-04 Distribution System Upgrades Project to P.T. Ferro Construction Co. in the Amount of $361,476.41
Attachments: 1. Approver Report
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

TO:                                           Mayor and City Council

 

FROM:                      Allison Swisher, Director of Public Utilities

 

SUBJECT:

title

Approval of Change Order No. 1 for Contract No. 2938-0126 for the JOL-08-04 Distribution System Upgrades Project to P.T. Ferro Construction Co. in the Amount of $361,476.41

end

 

BACKGROUND:

On March 3, 2026, the Mayor and City Council awarded a Contract for the JOL-08-04 Distribution System Upgrades Project, in the amount of $15,196,257.72, on behalf of P.T. Ferro Construction Co. based on the Unit Prices provided in their bid.

 

The Public Service Committee will review this matter.

 

CONCLUSION:

Change Order No. 1 is for cost adjustments for work completed to date and installation of additional water main on Bluff Street.  The following is a description of the work included within this change order:

•                     Additional water main installation from the proposed PRV station to Jefferson Street along Bluff Street

•                     Quantity adjustments for work completed to date

•                     Sanitary service and riser at 1261 Morgan

•                     Storm sewer management and pumping at Bluff Street

•                     Remove and replace 10" water main at 1053 Morgan

•                     Remove and replace 10" water main at Morgan and Wheeler

•                     Repair water service at Morgan and Haldemann

•                     Downtime and reconfiguration for 24" sanitary at Morgan & William

•                     Locate and repair unknown services at 219 and 221 Wheeler

•                     Re-route CSO chamber outfall

•                     Temporary sanitary storage manhole

•                     Sanitary, 24" x 6" fitting and coupling at Marian & Beach

•                     IDOT permit bond - Raynor & Jefferson

•                     Hot mix asphalt patch, 10"

•                     Casing pipe, 16"

•                     Sanitary force main, 3" sdr-21 PVC (open cut)

•                     Traffic control and protection, special - Bluff and Jefferson

•                     Connect to water main (non-pressure), 24-inch

•                     Fire hydrant relocation - Bluff Street

•                     Abandonment of existing water mains and appurtenances

•                     Class D patch, special, 10-inch

•                     Hot-mix asphalt surface mill and overlay, 2-inch

•                     Brick sidewalk removal and replacement

•                     Pavement marking, white, 24-inch (thermoplastic)

 

Funds will be charged to the Alternative Water Source Program - Joliet Fund (Org 54080000, Object 557200, $361,476.41).

 

RECOMMENDATION:

recommendation

Based on the above, it is recommended that the Mayor and City Council approve Change Order No. 1 for an increased amount of $361,476.41 for the JOL-08-04 Distribution System Upgrades Project, on behalf of P.T. Ferro Construction Co.