TO: Mayor and City Council
FROM: Beth Beatty, City Manager
SUBJECT:
title
Award of Contract for the 2024 Sanitary Sewer Rehabilitation Program - Bridalwreath Acres, Stonegate, Black Road Acres, and Bevan Acres to National Power Rodding Corp. in the amount of $2,428,331.50
end
BACKGROUND:
The City of Joliet owns and operates a wastewater collection system that consists of approximately 13,484 manholes and 592 miles of sanitary sewers with pipe diameters ranging from 4" to 72". The age of the sewer system ranges from the late 1800s. In 2016 the City completed a Utility Department Efficiency Study which recommended rehabilitating a minimum of 1% of the sewer mains in the system annually. Furthermore, the IEPA has stipulated in the City's NPDES permits for the City's wastewater treatment plants that a Capacity Management Operations and Maintenance (CMOM) plan be prepared. This plan requires a program for reduction of inflow and infiltration. In order to meet the goals of the City's approved efficiency study implementation plan and NPDES permits, a ten-year sewer rehabilitation program was prepared. The goals of the rehabilitation program are to restore the structural integrity of the system, reduce inflow and infiltration, and reduce the occurrence of basement back-ups. The priority project areas to be completed in Year 7 of the rehabilitation program are Bridalwreath Acres, Stonegate, Black Road Acres, and Bevan Acres. The rehabilitation program for these areas will include pre-cleaning and televising, cured-in-place-pipelining, manhole rehabilitation, and chemical grouting.
The sanitary sewer system in these areas has a history of basement backups, primarily on Bevan Drive. The primary goal of this sewer rehabilitation work is to reduce inflow and infiltration and eliminate root balls that can result in basement backups. Construction is anticipated to begin in February 2024 and is scheduled to be completed by December 2024.
Design drawings and b...
Click here for full text